Associated Projects
![](/sites/default/files/styles/medium_thumb_480x360_/public/img/c/500-kV-Pakistan.jpg?itok=TT4-_cEM)
- Project: 500 kV double-circuit transmission line connecting the 500 kV Tarbela 5th extension switchyard to the 765/500 kV Islamabad west substation - approx. 50km
- Country: Pakistan
- Details: 4 X ACSR Drake 795 MCM / conductor build 26x4.44 + 7X3.45
- Tender submitted: April 12, 2020
![](/sites/default/files/styles/medium_thumb_480x360_/public/img/c/Lamphun3%E2%80%93Chom.jpg?itok=7iXi4wnG)
- Project: 230 kV Lamphun 3–Chom Thong transmission line - lot 1 53.3km
- Country: Thailand
- Details: ACSR/GA 1272 MCM
- Tender submitted: September 16, 2019
![Supply of ACSR moose conductor - Nepal](/sites/default/files/styles/medium_thumb_480x360_/public/img/c/NIETTP.jpg?itok=-DtuBpHE)
- Project: supply of aluminium conductor steel reinforced (ACSR) moose conductor associated with Nepal–India Electricity Transmission and Trade Project (NIETTP) / lot 6 288km
- Country: Nepal
- Details: ACSR MOOSE
- Tender submitted: June 23, 2019
![](/sites/default/files/styles/medium_thumb_480x360_/public/img/c/dawei_0.jpg?itok=sm5vQBib)
- Project: 230/66/11 kV Mawlamyine–Ye–Dawei transmission line - Myanmar / Route 8 between Ye and Dawei 289.1 km
- Country: Myanmar
- Details: ACSR 605MCM +XLPE 1C 400 SQ.MM.
- Tender submitted: March 23, 2019
![](/sites/default/files/styles/medium_thumb_480x360_/public/img/c/Khandukhal%E2%80%93Rampura.jpg?itok=Sgw0glj2)
- Project: 400 kV Khandukhal–Rampura double-circuit transmission line / lot 1 + lot2 total 181km
- Country: India
- Details: 4 x ACSR bersimis conductor 690 SQ.MM. / conductor build 42 X 4.57 + 7 X 4.57
- Tender submitted: March 18, 2019
![Kabirpur–Kaliakoir and Kaliakoir–Tangail double-circuit transmission lines](/sites/default/files/styles/medium_thumb_480x360_/public/img/c/Kabirpur%E2%80%93Kaliakoir.jpg?itok=DN21C0OF)
- Project: Reconductoring 132 kV Kabirpur–Kaliakoir and Kaliakoir–Tangail double-circuit transmission lines / 60km
- Country: Bangladesh
- Details: ACSR conductor 636MCM / conductor build 26/7.
- Tender submitted: January 26, 2019
![132 kV Hasil Pur–Ludden transmission line](/sites/default/files/styles/medium_thumb_480x360_/public/img/c/%20Hasil-Pur%E2%80%93Ludden.jpeg?itok=HZ1PRw6n)
- Project: 132 kV Hasil Pur–Ludden transmission line / 27km
- Country: Pakistan
- Details: Panther - ACSR 30/7
- Tender submitted: November 12, 2018
![](/sites/default/files/styles/medium_thumb_480x360_/public/img/c/%20Sang%E2%80%93Pleiku-line_0.jpg?itok=JsIfSNZQ)
- Project: 500 kV Doc Sang–Pleiku, Quang Trach–Vung Ang and Quang Khe transmission lines - Lot 4 From start point to 61-01 section
- Country: Vietnam
- Details: Double circuit - 4 x ACSR 330/42
- Tender submitted: November 10, 2018
![33 kV and 11 kV Overhead lines - Coastal P1 to P570, Kpg Kelulit](/sites/default/files/styles/medium_thumb_480x360_/public/img/c/%20Miri-Malaysia.jpg?itok=6oGCnNT4)
- Project: 33 kV and 11 kV Overhead lines - Coastal P1 to P570, Kpg Kelulit
- Country: Malaysia
- Details:Quadruplex Service Drop Cable with street lighting
- Tender submitted: October 31, 2018
Company Profile
News and Resources
- SGS testing Mar 11 2021
- Electrical wires order Mar 10 2021
- All Production starts after the Chinese New Year holiday Mar 09 2021
- Orders from Bolivia Mar 07 2021
- The test for AAAC Conductor by SGS Dec 30 2020
- AAC Conductor and ABC cables to Iraq Dec 28 2020