500 kV double-circuit transmission line - Pakistan
- Project: 500 kV double-circuit transmission line connecting the 500 kV Tarbela 5th extension switchyard to the 765/500 kV Islamabad west substation - approx. 50km
- Country: Pakistan
- Details: 4 X ACSR Drake 795 MCM / conductor build 26x4.44 + 7X3.45
- Tender submitted: April 12, 2020